Silcon Construction Portfolio – Project Marry Me Mochi – Hillcrest Mall

Short-Term Lease Fit-Out | Accelerated Timeline Delivery | Fully Operational Retail Environment Ready for Immediate Opening

Trusted on high-traffic commercial sites

Project Overview

This project’s requirements were to bring a premium mochi donut retail space to life swiftly in the bustling Hillcrest Mall—without disrupting daily operations or jeopardizing critical occupancy deadlines. Silcon provided full-spectrum project management for this short-term lease, maintaining ironclad control over design fidelity, construction excellence, accelerated timelines, and unwavering compliance with landlord and mall regulations.

Project Execution – Step-by-Step Process

Pre-Construction & Planning

  • Reviewed design intent and tenant requirements to align with mall standards
  • Developed accelerated schedule to meet short-term lease deadlines
  • Coordinated permits, landlord approvals, and stakeholder alignment for zero-disruption execution

Custom Millwork Fabrication & Installation

  • Fabricated and installed brand-specific millwork to exact specifications
  • Maintained precise alignment with design vision and mall guidelines

Finish Painting & Detailing

  • Applied high-quality, durable finishes for premium aesthetic
  • Completed detailed touch-ups to achieve flawless brand presentation

Sprinkler System Coordination & Modifications

  • Modified and coordinated sprinklers to preserve full life-safety compliance
  • Ensured no interruptions to mall-wide fire protection systems

Electrical Rough-In & Fixture Installation

  • Performed complete electrical rough-in and installed fixtures
  • Tested and verified for reliable, code-compliant power delivery

Furniture Procurement & Installation

  • Sourced and installed all required furniture elements
  • Finalized placement to optimize customer flow and brand experience

Final Closeout & Handover

  • Conducted thorough quality inspections, punch-list resolution, and compliance verification
  • Delivered keys and as-built documentation for immediate tenant opening
  • Ensured seamless transition with no operational downtime

Project Highlights & Outcomes:

NEXT PROJECT

Winners – Upper Canada Mall