Silcon Construction Portfolio – OPS Reno – Scarborough Town Centre

Executive Office Renovation | International Ownership Standards | Sophisticated, High-Performance Workplace Delivered

Trusted on high-traffic commercial sites

Project Overview

Silcon completed a full interior renovation of the operations facility at Scarborough Town Centre, delivering a modern, code-compliant space built for daily mall operations. The scope included a new universal washroom, change room, private office, and staff lunchroom—plus ceiling demolition, structural reframing, epoxy flooring, suspended ceilings, and full mechanical, electrical, plumbing, and life-safety upgrades. All work was coordinated around active mall operations with no disruption to staff or tenants. The result: a functional, future-ready facility that improves workflow, meets current accessibility standards, and is built to last.

Project Execution – Step-by-Step Process

Pre-Construction & Planning

  • Collaborated closely with mall operations team to define functional requirements
  • Developed detailed renovation strategy for accessibility, workflow, and long-term performance
  • Coordinated permits, code compliance, and stakeholder approvals with zero operational risk

Demolition & Site Preparation

  • Executed complete ceiling demolition and selective interior deconstruction
  • Exposed and assessed existing building systems for accurate integration

Structural Framing & Layout Reconfiguration

  • Installed new structural framing to support redesigned floor plan
  • Created dedicated zones for universal washroom, change room, office, and staff lunchroom

Mechanical, Plumbing & Exhaust Upgrades

  • Upgraded sanitary and domestic water services to support new fixtures
  • Installed dedicated kitchen and washroom exhaust systems engineered for code compliance and efficiency
  • Modernized and balanced HVAC distribution for optimal comfort and energy performance

Ceiling, Flooring & Finishes Installation

  • Integrated new suspended ceiling systems with lighting, mechanical, and life-safety components
  • Applied durable, high-traffic epoxy flooring throughout service areas
  • Completed premium interior finishes to elevate aesthetics and functionality

Electrical & Life-Safety Modernization

  • Upgraded electrical distribution and lighting systems for reliability
  • Ensured full integration of fire-protection and life-safety components to current standards

Final Closeout & Handover

  • Conducted comprehensive quality inspections, system commissioning, and punch-list resolution
  • Delivered full as-built documentation and operations team walkthrough
  • Handed over a modernized, fully operational facility with no downtime

Project Highlights & Outcomes:

NEXT PROJECT

Yorkdale Mall Hoardings